Commit Graph
394 Commits
Author SHA1 Message Date
paulomassigue 71551deb73 restaturacao da cor nornmal de porque incvestir em Mocambique 2026-10-26 16:02:04 +02:00
paulomassigue ae0d74bb3a azul claro como fundo em porque investir em mocambique
tests / ci (push) Canceled after 0s
2026-10-26 15:06:35 +02:00
paulomassigue 894ca4ec69 correcao de conflitos
tests / ci (push) Canceled after 0s
2026-10-26 14:57:27 +02:00
paulomassigue 4da7a16a50 mudanca da cor em por que investir em Mocambique 2026-10-26 14:54:49 +02:00
nala 0bd5d49550 feat(irpc): reuse L6 monthly quotas for qualified CBF16 in QA
tests / ci (push) Canceled after 0s
2026-10-26 14:24:28 +02:00
nala aed020d19e docs(irpc): reconcile installed L7 server capacity and next monthly asset scope 2026-10-26 14:02:57 +02:00
nala 1649710cf7 docs(irpc): record grouped L7 installation and concrete remaining scope 2026-10-26 13:05:56 +02:00
nala e07f89da3d Merge demonstrated L7 treatments preserving concurrent portal changes and accepted history
tests / ci (push) Canceled after 0s
2026-10-26 12:53:38 +02:00
nala ab2ff2fdbc feat(irpc): qualify L7 expenses and compatible special treatments in QA 2026-10-26 12:14:52 +02:00
paulomassigue a2122dc34c correcao de conflitos
tests / ci (push) Canceled after 0s
2026-10-26 12:02:22 +02:00
nala d37fffb2d2 docs(irpc): accept bounded L6 operations and delimit L7 treatments 2026-10-26 11:46:33 +02:00
nala 45fd591c7f docs(irpc): record 5aaf1a56 delivery and separate remaining code from documentary questions 2026-10-26 11:07:26 +02:00
paulomassigue 17d633c99c Adicao do texto por que investir em Moz e ajuste dos elementos 2026-10-26 11:01:35 +02:00
nala 5aaf1a56f9 feat(irpc): prepare exact values and documented M20 M22 field mappings
tests / ci (push) Canceled after 0s
2026-10-26 10:51:05 +02:00
nala 2116f66b2b docs(irpc): record 56475acb installation and remaining L6 scope 2026-10-26 10:33:32 +02:00
paulomassigue 8f1ab24b22 acrescimo no hero de Porquê investir em Moçambique?
Partir de uma ideia Sectores de investimento
2026-10-26 10:22:17 +02:00
nala 56475acb2f feat(irpc): map short periods and foreign currency plans with explicit simulation evidence
tests / ci (push) Canceled after 0s
2026-10-26 09:55:25 +02:00
nala 0effdc9fcb docs(irpc): record e9fe1022 installation and partial L6 scope 2026-10-26 09:44:28 +02:00
nala e9fe102259 feat(irpc): demonstrate documented depreciation methods and prior quotas
tests / ci (push) Canceled after 0s
2026-10-26 09:24:06 +02:00
nala 44d0858cee docs(irpc): record 043dd35d installation and remaining L6 cases 2026-10-26 08:43:14 +02:00
nala 043dd35d8e feat(irpc): prepare scoped cost limits provisions and timing in QA
tests / ci (push) Canceled after 0s
2026-10-26 08:29:28 +02:00
nala f400e56a5b docs(irpc): record a2de7259 delivery and bounded L6 remainder 2026-10-25 22:39:35 +02:00
nala a2de725901 feat(irpc): prepare compatible L6 schedules and scoped form mappings in QA
tests / ci (push) Canceled after 0s
2026-10-25 22:29:06 +02:00
nala 82d0d05887 Record installed normal colecta and concrete L6 remainder separate from L7 L8 2026-10-25 22:11:55 +02:00
nala 2f684e5984 Calculate scoped normal IRPC colecta and preserve annual settlement boundary
tests / ci (push) Canceled after 0s
2026-10-25 21:58:59 +02:00
nala b8d45796dd Determine scoped IRPC taxable base from documented own loss balances 2026-10-25 21:46:59 +02:00
nala 5e02c23af8 Complete scoped IRPC taxable profit with explicit evidence states
tests / ci (push) Canceled after 0s
2026-10-25 21:33:51 +02:00
nala 664c88c8f7 Start scoped normal IRPC adjustments and record operational L5 installation 2026-10-25 21:22:42 +02:00
nala 7a11c4ef8f Specify AT interest and CER questions and label simulation assumptions
tests / ci (push) Canceled after 0s
2026-10-25 21:04:53 +02:00
nala acf8ec3cb5 Prepare documented interest calculations and separate MRFTA working cases 2026-10-25 20:52:21 +02:00
nala 5fa64bc0f4 Preserve exact original BM source bytes in the QA archive
tests / ci (push) Canceled after 0s
2026-10-25 20:19:53 +02:00
nala 85e3cd5c7b Prepare scoped MRFTA and documented compensatory interest with QA recovery 2026-10-25 20:19:08 +02:00
nala ce746d889d Implement scoped IRPC reliefs and PT-MZ royalties with QA recovery evidence
tests / ci (push) Canceled after 0s
2026-10-25 19:56:32 +02:00
nala 2b33a1c343 Identify IRPC income category and retention nature in Portuguese
tests / ci (push) Canceled after 0s
2026-10-25 19:20:44 +02:00
nala 4d6f828230 Group compatible IRPC withholding rates and reuse delivered FX selection 2026-10-25 19:14:46 +02:00
nala da0d8abb47 Start scoped IRPC L5 withholding workflow with document and payment reuse 2026-10-25 18:45:04 +02:00
nala 5c0cb25cea Preserve documented liberatory settlement when changing ISPC route
tests / ci (push) Canceled after 0s
2026-10-25 18:18:03 +02:00
nala 3dda7130ee Group ISPC occasional operations, excess acquisition treatment and 2026 formal preparation in QA 2026-10-25 18:12:34 +02:00
nala 6af7092e83 Reconcile installed L3 receipt and preserve current balance in compatible ISPC QA
tests / ci (push) Canceled after 0s
2026-10-25 17:15:52 +02:00
nala 49b448eb47 Prepare compatible ISPC quarterly QA on L3 baseline without experimental P001 changes 2026-10-25 17:11:58 +02:00
nala 0f4df8a4d1 Prepare compatible L3 additional delivery with preserved residuals and accepted proofs
tests / ci (push) Canceled after 0s
2026-10-25 16:38:24 +02:00
nala b189d0fa43 Prepare exact beverage partitions, fiscal gap diagnostics and L3 form review in QA 2026-10-25 15:55:25 +02:00
nala dbeaf886ee Record installed L3 E delta and keep L3 and L1 L2 residuals open 2026-10-25 15:29:38 +02:00
nala 7ad187f9f0 Prepare demonstrated L3 E delivery after verified backup and isolated restore
tests / ci (push) Canceled after 0s
2026-10-25 15:25:44 +02:00
nala 4708662532 feat(iva): prepare beverage restitution QA and retain residual scope 2026-10-25 15:08:10 +02:00
nala 46944402da Record installed grouped L3 C D delta and preserved residuals 2026-10-25 14:53:45 +02:00
nala de36f02880 Prepare grouped L3 C D delivery after verified backup restore
tests / ci (push) Canceled after 0s
2026-10-25 14:50:04 +02:00
nala 9e2d90c880 Prepare L3 D refund lifecycle and grouped C D QA delivery with preserved credits 2026-10-25 14:47:03 +02:00
nala b7a745e64f Prepare L3 C substitutions with frozen predecessor and payment reconciliation in QA 2026-10-25 14:23:56 +02:00
nala 3aa851a467 Record installed L3 A/B delta and preserved residuals 2026-10-25 14:13:30 +02:00