Commit Graph
421 Commits
Author SHA1 Message Date
nala f94007acfc docs(navigation): record QA reconciliation and preserve accepted coverage 2026-10-28 20:10:23 +02:00
nala 63b654ba1b docs(proactive): clarify installed status and connector-dependent visual validation 2026-10-28 19:33:20 +02:00
nala dc34894bde docs(proactive): mirror installed supply receipt and preserve remaining coverage 2026-10-28 19:27:28 +02:00
nala 3c293dbee0 docs(proactive): record private supply integration in QA and remaining coverage 2026-10-28 17:31:41 +02:00
nala 70c71739b2 docs(proactive): record list-backed supply comparison as not demonstrated 2026-10-28 15:12:43 +02:00
nala 324a20ea73 docs(irpc): mirror installed grouped delivery and partial L8 balance 2026-10-28 14:52:57 +02:00
nala a4dc45db5d docs(irpc): mirror economic QA and compatible grouped delivery receipt 2026-10-28 14:32:45 +02:00
nala daf0465489 docs(irpc): mirror prior-credit QA receipt and remaining L8 scope 2026-10-28 14:01:52 +02:00
nala 974139a710 docs(irpc): mirror verified international credit delivery receipt 2026-10-27 15:23:29 +02:00
nala bbdac0821a docs(irpc): record international credit QA and remaining L8 scope 2026-10-27 14:57:56 +02:00
nala 6f363df462 docs: record verified PEC delivery and concrete remaining L8 scope 2026-10-27 14:21:04 +02:00
nala 5fdcc98d05 docs: record verified sector navigation installation and preservation receipts 2026-10-27 13:57:41 +02:00
nala a8026f346e docs: record bounded PEC QA scope, proofs and remaining L8 work 2026-10-27 13:16:19 +02:00
nala 56c9788928 docs: record pending team usability evaluation and exercise guide 2026-10-27 12:58:34 +02:00
nala fa9c5a5be8 docs: reconcile installed L8 and proactive delivery status 2026-10-27 12:53:10 +02:00
nala 289877d6a4 docs: preserve authorised L8 then proactive execution handoff 2026-10-27 12:17:02 +02:00
nala 18fefc5a09 docs: record team UI autonomy and next installation conditions 2026-10-27 12:05:57 +02:00
nala c64ecea04e docs: record prospecting handoff and private Gurue QA pilot 2026-10-27 11:40:26 +02:00
nala 03cd76ae28 docs(investment): preserve private regional study and independent technical release 2026-10-27 10:58:07 +02:00
nala d3b3cb6cb2 docs(investment): preserve opportunity focus and independent technical delivery 2026-10-27 10:39:36 +02:00
nala 11fcf48156 docs(investment): record real-source pilot and preserve separate QA runtime 2026-10-27 10:22:35 +02:00
nala 4f1be49d39 docs(investment): register isolated proactive QA candidate without runtime integration 2026-10-27 09:43:06 +02:00
nala 1244fc8b7a docs(irpc): record L8 delivery capacity hold without changing runtime 2026-10-27 08:08:56 +02:00
nala 109e0cef51 docs(irpc): mirror first L8 QA proof without merging root runtime 2026-10-26 17:03:12 +02:00
nala 717370e537 docs(irpc): record combinations installation and delimit first L8 settlement 2026-10-26 16:32:26 +02:00
nala d7a76ab17a docs(irpc): record combinations compatibility with current main 2026-10-26 16:08:45 +02:00
nala 3eda84ef79 docs(irpc): record combinations QA and remaining simulator effort reference 2026-10-26 16:04:05 +02:00
nala b68936290c docs(irpc): record grouped CBF16 installation and remaining L7 scope 2026-10-26 15:37:27 +02:00
nala 7b2f368642 docs(irpc): record grouped cessation and prior quota QA coverage 2026-10-26 15:21:05 +02:00
nala d77c51f291 docs(irpc): record resident start period QA and concrete L7 balance 2026-10-26 14:55:42 +02:00
nala 57d4bc1cf4 docs(irpc): record monthly CBF16 installation and next short-period scope 2026-10-26 14:43:42 +02:00
nala e4e67e8228 docs(irpc): record monthly CBF16 QA and grouped delivery limits 2026-10-26 14:24:29 +02:00
nala 46ab0abcb0 docs(irpc): reconcile installed L7 server capacity and next monthly asset scope 2026-10-26 14:02:59 +02:00
nala 56b94011ba docs(irpc): record grouped L7 installation and concrete remaining scope 2026-10-26 13:05:58 +02:00
nala 97171c5e1e docs(irpc): record grouped L7 QA evidence and remaining scope 2026-10-26 12:14:53 +02:00
nala 07dd6dd221 docs(irpc): accept bounded L6 operations and delimit L7 treatments 2026-10-26 11:46:35 +02:00
nala 31651a76b1 docs(irpc): record installed values forms and consolidated L6 balance 2026-10-26 11:07:32 +02:00
nala 823d6b3559 docs(irpc): record verified short-period and currency installation 2026-10-26 10:33:38 +02:00
nala f2f6ffca88 docs(irpc): record verified amortisation installation 2026-10-26 09:44:38 +02:00
nala 0b0dbc5214 docs(irpc): record delivered costs and amortisation next scope 2026-10-26 08:47:34 +02:00
nala 75bb95f2b4 docs(irpc): record installed L6 sets and six bounded remaining groups 2026-10-25 22:39:45 +02:00
nala cd65e41e84 Record installed colecta and delimit remaining normal IRPC work 2026-10-25 22:12:05 +02:00
nala 744bfccb69 Record joint taxable base and normal colecta QA with L8 boundary 2026-10-25 21:59:03 +02:00
nala b8435c1a0e Record installed taxable profit and scoped taxable base QA evidence 2026-10-25 21:47:02 +02:00
nala dc1c85bf8e Record scoped taxable profit demonstration and joint L6 delivery preparation 2026-10-25 21:33:55 +02:00
nala 40b76278d5 Record installed L5 scope and first normal IRPC adjustment QA evidence 2026-10-25 21:22:45 +02:00
nala f6c3c28ac6 Record exact AT clarification questions in existing fiscal matrix 2026-10-25 21:04:56 +02:00
nala c42b36db62 Record bounded interest and CER QA evidence and remaining scope 2026-10-25 20:52:22 +02:00
nala ec6d951e31 Record installed MRFTA delivery and fresh preservation evidence 2026-10-25 20:36:02 +02:00
nala 321901cec5 Prepare exact MRFTA delivery and delimit remaining interest and CER work 2026-10-25 20:24:50 +02:00