nala 18fefc5a09 docs: record team UI autonomy and next installation conditions 2026-10-27 12:05:57 +02:00
nala c64ecea04e docs: record prospecting handoff and private Gurue QA pilot 2026-10-27 11:40:26 +02:00
nala 03cd76ae28 docs(investment): preserve private regional study and independent technical release 2026-10-27 10:58:07 +02:00
nala d3b3cb6cb2 docs(investment): preserve opportunity focus and independent technical delivery 2026-10-27 10:39:36 +02:00
nala 11fcf48156 docs(investment): record real-source pilot and preserve separate QA runtime 2026-10-27 10:22:35 +02:00
nala 4f1be49d39 docs(investment): register isolated proactive QA candidate without runtime integration 2026-10-27 09:43:06 +02:00
nala 1244fc8b7a docs(irpc): record L8 delivery capacity hold without changing runtime 2026-10-27 08:08:56 +02:00
nala 109e0cef51 docs(irpc): mirror first L8 QA proof without merging root runtime 2026-10-26 17:03:12 +02:00
nala 717370e537 docs(irpc): record combinations installation and delimit first L8 settlement 2026-10-26 16:32:26 +02:00
nala d7a76ab17a docs(irpc): record combinations compatibility with current main 2026-10-26 16:08:45 +02:00
nala 3eda84ef79 docs(irpc): record combinations QA and remaining simulator effort reference 2026-10-26 16:04:05 +02:00
nala b68936290c docs(irpc): record grouped CBF16 installation and remaining L7 scope 2026-10-26 15:37:27 +02:00
nala 7b2f368642 docs(irpc): record grouped cessation and prior quota QA coverage 2026-10-26 15:21:05 +02:00
nala d77c51f291 docs(irpc): record resident start period QA and concrete L7 balance 2026-10-26 14:55:42 +02:00
nala 57d4bc1cf4 docs(irpc): record monthly CBF16 installation and next short-period scope 2026-10-26 14:43:42 +02:00
nala e4e67e8228 docs(irpc): record monthly CBF16 QA and grouped delivery limits 2026-10-26 14:24:29 +02:00
nala 46ab0abcb0 docs(irpc): reconcile installed L7 server capacity and next monthly asset scope 2026-10-26 14:02:59 +02:00
nala 56b94011ba docs(irpc): record grouped L7 installation and concrete remaining scope 2026-10-26 13:05:58 +02:00
nala 97171c5e1e docs(irpc): record grouped L7 QA evidence and remaining scope 2026-10-26 12:14:53 +02:00
nala 07dd6dd221 docs(irpc): accept bounded L6 operations and delimit L7 treatments 2026-10-26 11:46:35 +02:00
nala 31651a76b1 docs(irpc): record installed values forms and consolidated L6 balance 2026-10-26 11:07:32 +02:00
nala 823d6b3559 docs(irpc): record verified short-period and currency installation 2026-10-26 10:33:38 +02:00
nala f2f6ffca88 docs(irpc): record verified amortisation installation 2026-10-26 09:44:38 +02:00
nala 0b0dbc5214 docs(irpc): record delivered costs and amortisation next scope 2026-10-26 08:47:34 +02:00
nala 75bb95f2b4 docs(irpc): record installed L6 sets and six bounded remaining groups 2026-10-25 22:39:45 +02:00
nala cd65e41e84 Record installed colecta and delimit remaining normal IRPC work 2026-10-25 22:12:05 +02:00
nala 744bfccb69 Record joint taxable base and normal colecta QA with L8 boundary 2026-10-25 21:59:03 +02:00
nala b8435c1a0e Record installed taxable profit and scoped taxable base QA evidence 2026-10-25 21:47:02 +02:00
nala dc1c85bf8e Record scoped taxable profit demonstration and joint L6 delivery preparation 2026-10-25 21:33:55 +02:00
nala 40b76278d5 Record installed L5 scope and first normal IRPC adjustment QA evidence 2026-10-25 21:22:45 +02:00
nala f6c3c28ac6 Record exact AT clarification questions in existing fiscal matrix 2026-10-25 21:04:56 +02:00
nala c42b36db62 Record bounded interest and CER QA evidence and remaining scope 2026-10-25 20:52:22 +02:00
nala ec6d951e31 Record installed MRFTA delivery and fresh preservation evidence 2026-10-25 20:36:02 +02:00
nala 321901cec5 Prepare exact MRFTA delivery and delimit remaining interest and CER work 2026-10-25 20:24:50 +02:00
nala d3cdddde96 Record scoped MRFTA and interest QA after installed reliefs delivery 2026-10-25 20:19:12 +02:00
nala abc050f14d Record installed IRPC reliefs delivery and fresh preservation evidence 2026-10-25 20:07:36 +02:00
nala c641b267ac Publish agribusiness lot through scoped management and extend existing dossier for multiple opportunities
tests / ci (push) Canceled after 0s
2026-10-23 10:49:50 +02:00
nala 7d08c2c664 Register 34 private agribusiness opportunities with promotional management and investor paths in QA 2026-10-23 10:15:41 +02:00
nala e03de682ca Preserve completed features and restore approved portfolio visibility
tests / ci (push) Canceled after 0s
2026-10-23 09:19:25 +02:00
nala 37a8eb015a docs: record private legacy registration and authenticated editorial access
tests / ci (push) Canceled after 0s
2026-10-22 23:55:57 +02:00
nala fb4e7d8970 Complete private legacy article editing and previews in QA 2026-10-22 23:36:07 +02:00
nala bc93ccdb9e docs: reconcile all legacy articles and verify private QA batches 2026-10-22 23:10:21 +02:00
nala 7ccf62adec docs: record authenticated tender installation and final links
tests / ci (push) Canceled after 0s
2026-10-22 22:54:59 +02:00
nala e46f973159 docs: plan staged tender schema installation and activation 2026-10-22 22:44:42 +02:00
nala 1bcf34c0c0 feat: add QA tender and announcement publishing workflow 2026-10-22 22:41:28 +02:00
nala ef0c2acd36 docs: record authenticated homologation geometry restoration and access proof
tests / ci (push) Canceled after 0s
2026-10-22 22:04:32 +02:00
nala 15d82611b6 fix: recover territorial demarcation QA and prepare retained geometry restoration 2026-10-22 21:43:54 +02:00
nala 97d51db60a feat: add unified team content management entry in QA
tests / ci (push) Canceled after 0s
2026-10-22 20:55:08 +02:00
nala 1106509116 vrsao 2
tests / ci (push) Canceled after 0s
2026-10-08 14:02:01 +02:00
nala 59d108a576 resolvemos o problema dos ZEE e ZFI
tests / ci (push) Canceled after 0s