Files
compras/docs/proofs/production-destination.json
T
nala 36dcfdf00c
tests / ci (push) Canceled after 0s
commit melhorias compras4
2026-11-22 16:28:03 +02:00

29 lines
2.1 KiB
JSON

{
"date": "2026-11-22",
"status": "first_rq01_increment_implemented_and_available_in_qa_visual_acceptance_pending",
"source_authorization": "rq01-source-authorization.json",
"scope": [
"Production destination in the existing internal warehouse request",
"Optional production reference declared by the user, explicitly not verified against an external production system",
"Immutable request snapshot, delivery event metadata and existing single native stock operation link",
"Delivery print and CSV retain production context, including a literal reference of zero",
"Optional replenishment origin carries the same declared production reference into the native purchase request"
],
"validation": {
"sqlite_integrated": {"passed": 50, "assertions": 713, "log": "storage/logs/production-destination-integration.txt"},
"postgres_integrated": {"passed": 50, "assertions": 713, "isolated_database_removed": true, "log": "storage/logs/production-destination-pg.txt"},
"frontend_focused": {"passed": 14, "files": 4},
"one_eligible_approver_regression": {"passed": 1, "assertions": 9, "scope": "existing native level with two eligible approvers, not an eight-level configuration"},
"warehouse_exchange_regression": {"passed": 13, "assertions": 101, "database": "isolated SQLite", "scope": "Production is internal use in unchanged v1 wire contract; original detailed reference remains local"},
"typescript": "passed",
"phpstan": "passed: zero errors",
"scoped_frontend_format_lint": "passed",
"private_build": "passed: rq01-production-candidate-20261122"
},
"qa_preview": "production-destination-preview.json",
"pilot_post_preview_http": "draft-preparation-pilot-http.json",
"schemas_changed": false,
"pilot_business_commands": false,
"pending": ["Eight-level configurable approval routing", "Line account distributions and accounting integration through approved common mechanisms", "Company exception limits and deadlines", "External MRP or maintenance order integration", "Source document remaining requirements tracked in the existing matrix", "Full mobile, print preview and enterprise acceptance"]
}